Q. A can complete a piece of work in 4 days. B takes double the time taken by A, C takes double that of B, and D takes double that of C to complete the same task. They are paired in groups of two each. One pair takes two-thirds the time needed by the second pair to complete the work. Which is the first pair?

Question ID: 4228
  1. A, B
  2. A, C
  3. B, C
  4. A, D


❮ Prev       Next ❯